Electrocomp%u2019s management realizes that it forgot to include two critical co

ID: 1177233 • Letter: E

Question

Electrocomp%u2019s management realizes that it forgot to include two critical constraints (see Problem 7-14). In particular, management decides that to ensure an adequate supply of air conditioners for a contract, at least 20 air conditioners should be manufactured. Because Electrocomp incurred an oversupply of fans in the preceding period, management also insists that no more than 80 fans be produced during this production period. Resolve this product mix problem to find the new optimal solution.

Explanation / Answer

Let    X1 = the number of air conditioners scheduled to be produced

                     X2 = the number of fans scheduled to be produced

Maximize

25X1

+

15X2

(maximize profit)

Subject to:

3X1

+

2X2

%u2264

240

(wiring capacity constraint)

2X1

+

X2

%u2264

140

(drilling capacity constraint)

X1

%u2265

20

(a/c contract constraint)

X2

%u2264

80

(maximum # of fans constraint)

X1, X2

%u2265

0

(non-negativity constraints)

                     Optimal Solution: X1 = 40 X2 = 60 Profit = $1,900


Maximize

25X1

+

15X2

(maximize profit)

Subject to:

3X1

+

2X2

%u2264

240

(wiring capacity constraint)

2X1

+

X2

%u2264

140

(drilling capacity constraint)

X1

%u2265

20

(a/c contract constraint)

X2

%u2264

80

(maximum # of fans constraint)

X1, X2

%u2265

0

(non-negativity constraints)