You work for the South Queenstown Land Trust, where you\'ve been asked to decide
ID: 117889 • Letter: Y
Question
You work for the South Queenstown Land Trust, where you've been asked to decide other useful information for AP 10 whether to purchase the development rights of two properties: (1) a sod farm and, (2) a T-value -6 vegetable farm. Both have the same land area and are mapped as Enfield Silt Loam with a 0-3% slope. The SQLT uses the T- Harvested using sod cutter value as a criterion for purchasing development rights: if the estimated soil losses are higher than the T-value, the deal Soil loss rate 1 cmlyr Fig. 1. T-value, farm information, and Inputs of synthetic fertilizer and biosolids Bulk density = 1.3 Mg/m3 Vegetable Farm: you make a decision. 1. Calculate the soil loss from cacih Conventional tillage Synthetic fertilizer inputs farm using the information in Fig. 1 Bulk density = 1.1 Mg/m3 and decide which farmer gets the $3 | . Soil loss rate 0.5 cm/yr million for the development rights to Other Useful Information: their property 1ha = 10,000 2, ! 1 cm = 0.01 m what could the farmer that doesn't qualify for the $3 million do to reduce soil loss? Mass = Volume X DensityExplanation / Answer
1) Soil Loss (A) = R x K x LS x C x P
here R = rainfall and runoff factor
K = soil erodibility factor
LS = slope length-gradient factor
C = crop/vegetation and management factor
P = support practice factor
for sod farm (A) = R x K x LS x C x P
R = 100
K = 1cm/yr
LS = 0.4
C = 0.02
P = 0.75
A= 100*1*0.4*0.02*0.75 = 0.6 mg/ha/yr
for vegetable farm (A) = R x K x LS x C x P
R = 100
K = 0.5cm/yr
LS = 0.4
C = 0.5
P = 0.75
A= 100*0.5*0.4*0.5*0.75 = 7.5 mg/ha/yr
since vegetable farm soil loss is more than T value so sod farm farmer will get $3 million for the development rights to their property.
Related Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.