you have been assigned the task of comparing the economic results of three alter

ID: 1198494 • Letter: Y

Question

you have been assigned the task of comparing the economic results of three alternative designs for a state government public works prokect. The estimated values for various economic factors related to the three designs are given below. The MARR being used is 9% and the analysis period is 15 years.

a. Use the conventional benefit/cost ratio method, with AW as the equivalent worth measure, to select the preferred design for the project.

b. use the modified B/C ration method, with PW as the equivalent worth measure, to select the preferred design for the project.

Factor

Factor

1 2 3 Capital Investment $1,240,000 $1,763,000 $1,475,000 Salvage Value (end of year 15) 90,000 150,000 120,000 Annual O & M costs 215,000 204,000 201,000 Annual benefits to user group A 315,000 367,000 355,000 Annual benefits to other user groups 147,800 155,000 130,500