Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

An existing 4-lane dual carriageway highway with a base free flow speed 100 km/h

ID: 1711393 • Letter: A

Question

An existing 4-lane dual carriageway highway with a base free flow speed 100 km/hr is expected to experience an estimated 10% traffic growth rate. Currently, it has directional design hourly volume (DDHV) of 1800 veh/hr (comprises of 80% car/taxi/van, 5% motorcycles, 10% buses, 2% trucks, and 3% RV) with a peak hour factor (PHF) of 0.95. The highway is located at following terrain with the K and D factor has been estimated to be 0.15 and 0.60 respectively. The lanes are 3.3 m wide with 1.2 m obstruction on both sides of the highway and the adjacent highway segments have an average of 0.2 interchanges/km. (a) Calculate the estimated number of traffic operating the highway in a day. (b) Determine the level of service (LOS) that the highway is currently operates. (c) Determine at what year the highway will reach capacity.

Explanation / Answer

Please mention the question clearly. Some clarity was missing in question a. Please revise the question and send it again. Otherwise you may get wrong explanations. Dont think otherwise.

Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
Chat Now And Get Quote