I aylllenl Bönd, Performance Bond, and Guarantee Bond 30. The inspector usually
ID: 1732377 • Letter: I
Question
I aylllenl Bönd, Performance Bond, and Guarantee Bond 30. The inspector usually communicates with sub-contractors through: A. the architect/engineer B. C. D. E. the owner the consultant. the contractor's superintendent. an ombudsman 31. A residen t project representative may permit the use of substitute materials if A. he or she considers them equivalent. B. they cost the same price. C. there is a savings on the job by the substitution. D. they have been approved by the architect/engineer E. if they are better than those originally specified. or reject faulty work? ?.the architect/engineer. B.the foreman. C. the inspector D. the superintendent. E. the ownerExplanation / Answer
B)
The inspector usually communicates with the sub-contractor via the Main contractor, also known as a Consultant.
D)
A resident project may use alternative materials only after they have deemed fit to use by the Consulting on-site Engineer and Architect.
C)
The inspector has the final authority
Related Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.