Not sure if its legible enough put please show work and steps please SURVEYING S
ID: 1732559 • Letter: N
Question
Not sure if its legible enough put please show work and steps please
SURVEYING SPRING 2016 2nd Exam TOTAL S0 PT LARTHWORK CALCULATION: EXISTING GROUND ELEVATIOS AS SHOWN BELOW a Given Fuish Pad Flevations 179 ar, what isde value cheges in ?eit B, cat orarnn b. riven Finish Pad Elevation 179.. What is t?he value changes in pint E, cut or il (1.0 ps) c. Given Fiuish Pad Elevaign-179.0. do eatisuk calculatian, Bo Pi Mtod, 8 pts Cut voluzue? Fill volume? Total esth work volum:? Import ar Expont answer in U YARD. 1715 i 10' 1788 1792 80. ?27- 0 3 of 3Explanation / Answer
(1) Point B1 has lower elevation than finish, so it is fill, = 179=178.5 = 0.5'
(2) Point B2 has higher elevation than finish, so it is a cut = 179-179.2 = -0.2'
(3) Average elevation of the area = (177.0 +178.0 + 178.5 + 180 + 178.3 + 178.5 +179 + 180.2 + 178.8 + 179.2 + 180.1)/11 = 1967.6/11 = 178.872'
178.872' is lower than finish elevation of 179', so a fill of 179 - 178.872 = 0.128' thickness has to be
Total area = 20*30 - 10*10 = 500 square units.
So Fill Volume = Vc = 500*0.128 = 64 cubic feet, has to be borrowed/Imported.