On successful completion of the assignment, the student will be able, at thresho
ID: 1732637 • Letter: O
Question
On successful completion of the assignment, the student will be able, at threshold level, to:
1. select strategies for managing time in construction projects;
2. select strategies for managing cost in construction projects; and
3. select strategies for managing quality in construction projects.
Task
Each student is required to produce a report from the information provided in the Project Information folder in the VLE. Each report is to comprise of sections A, B and C as specified below.
Section A Time Schedule
Prepare a project time schedule. Include, as appendices, details of the inputs you use to create the project time schedule and show all the steps taken to implement the tools/techniques used to create the project time schedule.
Section B Cost Baseline
Use CESMM4 to prepare a schedule of quantities and associated cost baseline. Your schedule of quantities should follow the format set out in CESMM4. Your calculations that form the basis of the cost baseline should be included as an appendix.
Page 1 of 2
Section C Quality Assurance
Identify two quality requirements for the project. Explain how you would go about quality assurance with respect to the identified quality requirements.
For all sections:
state any assumptions you have had to make; and
it is expected that the report will demonstrate understanding of the inputs, tools/techniques and outputs of the processes in the respective knowledge areas in the Project Management Body of Knowledge.
Indicative Reading
Fiske, J (2013). CESMM4: Price & Carbon Book 2013. London: ICE Publishing.
PMI, (2013). A guide to the project management body of knowledge, 5th ed. Newton Square: PMI.
Stackpole, CS (2013). A user’s manual to the PMBOK guide – fifth edition. Hoboken, New Jersey: Wiley.
the images above (LEFT TO RIGHT ACROSS) are the various plans listed respectively below:
1st floor plan
2nd floor plan
3rd floor plan
foundation plan
ground floor plan
Project overview
roof plan
site details; and
typical section.
A- Lev1 FFL ? Typical edge detail 1i 20 ist floor GA : 100Explanation / Answer
1.create a flow communication
2.establish a needed procedure
3.make a habit of continous planning
4.observe and ask questions
5.use different tools to monitor costs and control budget
6.implement automated report system
If you follow above steps time ,cost , quality of project under control.