Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

Draw a bar chart for the preparation and serving of a meal for eight persons wit

ID: 1823582 • Letter: D

Question

Draw a bar chart for the preparation and serving of a meal for eight persons with the following menu: soup, salad, relishes, roast beef, baked potato, green peas, apple pie, rolls, wine, coffee, and tea. Assume all ingredients are on hand before preparation begins. Draw a bar chart for the preparation and serving of the meal in Exercise 1.1 but assume that the project is to begin with the time of purchase of each item from the grocery store. A small bus stop project is to be constructed at one side of a street. It consists of a stopping area for busses and a small shelter approximately 8'-0 by 16'-0 in plan (see Figure Ex. 1.1). The floor is to be a concrete slab and the walls are to be brick. There is a timber beam across the front to support a laminated timber roof. The structure is lighted by two light fixtures, one on each end wall. The existing curb and sidewalk are to be removed and replaced as shown to give stopping space for the busses out of the traffic lane. This stopping space will need to be repaved. The project has been broken down into steps and a construction time estimate has been made for each as follows. These steps' are not in any particular order. Draw a bar chart for this project. Shelter Slab: Includes the fine grading, casting of concrete, and finishing. Time: 2 days. Shelter Walls: Includes the laying of the brick for the walls and the inclusion of electrical conduit for the lighting. Time: 3 days. Shelter Roof: Includes the construction of the laminated roof, the covering with a built-up roofing, and the trimming of the edges. Time: 2 days. Roof Beam: Includes the cutting and erection of the beam. Time: 1/2 day. Cut Curb: Includes the cutting of the existing curb and breaking up of the existing curb and sidewalk. Time: 1 day. Excavation: Includes the removal of broken concrete curb and sidewalk, the excavation of the parking space, the excavation of the space for the shelter slab and sidewalk. Time: 2 days. Curb and Gutter: Includes the forming, casting, and finishing of the new curb and gutter. Time: 2 days. Sidewalk: Includes the forming, casting, and finishing of the new sidewalk. Time: 2 days. Shelter Seat: Includes the attachment of seat brackets to the wall and the construction of the seat. Time: 1 day. Lights: Includes the wiring and attachment of the light fixtures. Time: 1 day. Paint: Includes putting a natural stained exterior finish on the edges of the roof, the roof beam, and the shelter seat. Time: I day. Paving: Includes the laying of the finished paving in the parking strip. Time: 1 day.

Explanation / Answer

you have drawn it right. rate me A+. :)

Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
Chat Now And Get Quote