You have been given the job of creating a tender estimate for a bridge construct

ID: 1827927 • Letter: Y

Question

You have been given the job of creating a tender estimate for a bridge construction.

You have estimated quantities for various work items, as shown below:

Item 1: 1200 m3 of soil excavation

Item 2: 1700 m3 of rock excavation

Item 3: 2900 m3 of concrete

Tender responses are shown below:

Tenderer 1 submitted the following figures:

Unit cost for soil excavation = 10

Unit cost for rock excavation = 30

Unit cost for concrete = 95

Tenderer 2 submitted the following figures:

Unit cost for soil excavation = 40

Unit cost for rock excavation = 35

Unit cost for concrete = 110

Tenderer 3 submitted the following figures:

Unit cost for soil excavation = 35

Unit cost for rock excavation = 20

Unit cost for concrete = 100

Work item

Volume (m3)

Tender #

Unit cost ($/m3)

Total cost ($)

Soil excavation

1200

1

10

12000

2

40

48000

3

35

42000

Rock excavation

1700

1

30

51000

2

35

59500

3

20

34000

Concrete

2900

1

95

275500

2

110

319000

3

100

290000


What is the cost of the lowest tender?

Work item

Volume (m3)

Tender #

Unit cost ($/m3)

Total cost ($)

Soil excavation

1200

1

10

12000

2

40

48000

3

35

42000

Rock excavation

1700

1

30

51000

2

35

59500

3

20

34000

Concrete

2900

1

95

275500

2

110

319000

3

100

290000

Explanation / Answer

tender is the one with low cost and it is $338,500