Question
2/
can anyone please help me to solve questions on The first photo from the second one ... please
Completion Questions (See attached Word Bank) 40. Buildings represent a(n) for business and institutions in regard to the project costs to build and maintain it. 41. A project type for roads, bridges and highway projects is considered a(n) project where the scope of the work is generally large in scale. 42. A method for erecting a concrete structure known as construct the CNN Towner in Toronto, Canada. was used to 43. All decisions regarding the design and construction of a project are ultimately the decision of the 44. Design Professionals are responsible for the planning, investigation and preparation of contract documents. 45. The Designer takes responsibility for the entire protect design, unless multiple designers arc contracted by the Owner. 46. The professional contracted to provide accurate measurements of building. structures and sites arc called 47. Scheduling is the responsibility of the Contractor's 48. Design is the preliminary design phase where initial plan and elevation drawings arc produced and estimated construction costs arc based on square foot unit prices. 49. The is the Contractor's site representative. 50. is the process of assembling and coordinating the needed labor, material and equipment resources for a particular task.
Explanation / Answer
40.Investment
41. General
42. Staging
43. Project Manager
44. Design Development
45. Architect
46. Surveyors
47. Construction Manager
48. Engineering
49. Field Suprintendent
50. Mobilization