The following batch weights (cubic yard/ssd basis), selected using ACI 211.1, pr
ID: 1920992 • Letter: T
Question
The following batch weights (cubic yard/ssd basis), selected using ACI 211.1, produced concrete with a unit weight of 142.9 lb/ft3, a slump of 2 in., and an air content of 4%.
Material Quantities
Cement: 552 lb/yd3
Water: 265 lb/yd3
F.A.: 1184 lb/yd3
C.A.: 1779 lb/yd3
AEA: 11 oz/yd3
Material Data
C.A.: 1 inch; Unit wt (dry) = 95 lb/ft3; absorption (ssd) = 3.4%; S.G.(ssd) = 2.56; FSM = 1%
F.A.: FM = 2.80; S.G. (ssd) = 2.64; FSM = 2%
The following batch weights (cubic yard/ssd basis), selected using ACI 211.1, produced concrete with a unit weight of 142.9 lb/ft3, a slump of 2 in., and an air content of 4%.
Material Quantities
Cement: 552 lb/yd3
Water: 265 lb/yd3
F.A.: 1184 lb/yd3
C.A.: 1779 lb/yd3
AEA: 11 oz/yd3
Material Data
C.A.: 1 inch; Unit wt (dry) = 95 lb/ft3; absorption (ssd) = 3.4%; S.G.(ssd) = 2.56; FSM = 1%
F.A.: FM = 2.80; S.G. (ssd) = 2.64; FSM = 2%
- How much concrete was produced (yield)?
- What were the actual mix proportions on a cubic yard basis?
- What batch quantities (cubic yard/ssd basis) should be used to produce concrete with a 4 in. slump and 6% air?
Explanation / Answer
1.concrete yield produced was 3782lb/yd3
2. mix proportions based on cubic yards:1:2.19:3.19 per cubic yard
3. 1:1.74:6.22