On the basis of a preliminary report by a geological survey team, it is estimate
ID: 2075558 • Letter: O
Question
On the basis of a preliminary report by a geological survey team, it is estimated that a newly discovered oil field can be expected to produce oil at the rate of R(t) = 600t^2/t^3 + 32 + 5 (0 lessthanorequalto t lessthanorequalto 20) thousand barrels/year, t years after production begins. a) Write an integral expression that will allow you to find the amount of oil that the field can be expected to yield during the first 5 years of production, assuming that the projection holds true. b) Use your calculator to evaluate the expression.Explanation / Answer
The position of an arm is given by,
s = [(30) t2 - (20) t3] mm { eq.1 }
differentiating an above eq. w.r.t time, we have
v = [(60) t - (60) t2] mm/s { eq.2 }
again, differentiating eq.2 w.r.t time & we get -
a = [(60) - (120) t] mm/s2
(a) When (dv / dt) = a = 0. Then, we have
0 = [(60) - (120) t] mm/s2
t = 1/2 sec
At this time, the maximum velocity will be given as :
v = [(60) t - (60) t2] mm/s
v = [(60) (0.5 s) - (60) (0.5 s)2] mm/s
v = [(30) - (15)] mm/s
v = 15 mm/s
(b) When velocity is maximum, then the position and acceleration will be given as :
s = [(30) t2 - (20) t3] mm
s = [(30) (0.5)2 - (20) (0.5)3] mm
s = [(7.5) - (2.5)] mm
s = 5 mm
And
a = [(60) - (120) t] mm/s2
a = [(60) - (120) (0.5)] mm/s2
a = 0 mm/s2