i. Calculate, a rouh estimde cost Produced from of Steam Packaged\" boler Packag

ID: 2249206 • Letter: I

Question

i. Calculate, a rouh estimde cost Produced from of Steam Packaged" boler Packag meansyeu purchae and instull ell he eqipmat hecessary to produee the s steam at 15 bar. The mass flow rate of steam produced is 1oo 3/hr. Assumu no condensate is returnzd to the boiler. team.) The boiler wll prodvce saturatd Additional Lrfo Boiler efficiency-80% Fuel (nahrulaar) cost-#4 per MMBtu cost Cauinvahi Raw water cost #050/nutricton and supervisin costs = FO (4k'! wit.ssati.lly cesak casu.armahltFerat se units essentia rn thenrelves) Maintenanet cosf in mins ,ts «Tov Tough r. 6) Reporl-what % of tofulg.arl, cat is Madevp af: -Capital Cat Water Cesf Maintenanu Cos

Explanation / Answer

Steam Produced = 10000 Kg/hr

No.of days of operation = 350 days

No.of hours of operation = 350*24 = 8400 hrs

Total steam produced = 8400*10000 = 84*106 Kg

Pressure of steam = 15 bar

Boiler efficiency = 80%

1 MMBtu = 28.2636 m3 = 28263.6 Kg;

84*106 Kg = 84000 m3

Fuel (natural gas) required = 84000/(28.2636*0.8) = 3715 MMBtu required per year

Fuel (natural gas) cost = 3715*4 = $ 14860.1 / year

Fixed cost = $ 73000 / year  

Raw water cost = Total raw water required * 10-3 * 0.5 =( (84*106) / 0.8) * 10-3 * 0.5 = $ 53750

Maintenance cost = %1 of FCI = $ 730

a)

Total cost per year

= FCI + Fuel cost + Maintenace cost + Water cost = $ (73000 + 14860.1 + 730 + 53750 )

= $ 142,340.1

b)

%Capital cost to total cost = (73000/142,340.1) * 100 = 51.28 %

%Fuel cost to total cost = ( 14860.1/142,340.1) * 100 = 10.44 %

% Water cost to total cost = ( 53750/142,340.1) * 100 = 37.76 %

% Maintenance to total cost = (730/142340.1) * 100 = 0.512 %