GE 496-Spring 2018-Engels (1 pt) The architect works with the design team to pro
ID: 2312664 • Letter: G
Question
GE 496-Spring 2018-Engels (1 pt) The architect works with the design team to protect the best interests of the a. Contractor b. Plan checker c. Building inspector d. Owner (2 pts) The design and construction ' which TWO below: referees' that ensure the safety of the general public are a. Plan checker b. Architect c. Contractor d. Design team e. Building inspector f. Owner d pt Alimemberc on the desien team need t tke ito consideration a. Seismic forces b. Air movement c. Solar form d. Pedestrian circulation (6 pts) Th e consultants that most typically make up the design team are (Pick SIX): a. Civil b. Landscape c. Structural d. Interiors e. Irrigation f. Mechanical 8. Electrical h. Plumbing i. Fire suppression j. Acoustical (2 pts) The top TWO concerns for the contractor are: a. Schedule b. Inspections c. Submittals d. RFIs e. Subcontractor trades f. Budget (3 pts) The top three goals of integrated design are and integration. a. Physical b. Acoustical c. Visual d. Mechanical e. Performance f. EnergyExplanation / Answer
(1) Answer:- (d) owner
(2)Answer:- (a) Plan checker , (e) building inspector
(3) Answer:- (a) Seismic forces
(4) Answer:- (a) Civil , (b) Structural , (d) Interiors , (e) Irrigation , (f) Mechanical, (g) Electrical
(5) Answer:- (e ) Subcontractor trades , (f) Budget
(6) Answer:- physical , energy , performance