The asphalt -treated drainable base cannot be constructed using the hot-mix asph

ID: 2313008 • Letter: T

Question

The asphalt -treated drainable base cannot be constructed using the hot-mix asphalt paver.

(i) True

(ii) False

The static steel–wheel roller is recommended for compacting asphalt -treated drainable base

(i) True

(ii) False

The Portland cement-bound drainable base can be constructed using concrete mixture mixed at a

central plant.

(i) True

(ii) False

A chemically-modified subgrade should not be considered as a separator layer.

(i) Yes

(ii) True

In MEPDG, reliability is applied to individual performance indicator (distress).

i) True

ii) False

Explanation / Answer

Answer:-

(i) False

Ashfalt treated drainage base can be constructed using the hot mix asphalt paver .

(ii) True

(iii) True

(iv) False

(v) True