List the letter codes for the assumptions below that apply for each renewable source Low or No fuel costs Low operating costs Little or no environmental impacts Low capital costs Low maintenance costs Low power density High capital costs Significant environmental impact High power density Solar Water Heater Concentrating Solar Collector Biodiesel Biocthanol Biomass Biogas Hydroelectricity Tidal Barrage Tidal Lagoon Tidal Current Turbine What is grid parity (as it relates to photovoltaics)? How much land would be required for a concentrating solar power plant that generates approximately 130 GWh of electricity per year? How thick must a conventional solar be to ensure most of the incident photons are absorbed? What process involves the conversion process from vegetable oil to biodiesel? What type of turbine would you recommend when designing a medium head (100 m)Explanation / Answer
10.
12. On average, 1 GWh per year power requires 2.8 acres of land, implying for the 130 GWh per year power production it would require 364 acres of land.
13. Average thickness (silicon panel) = 200-250 micron.
Related Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
drjack9650@gmail.com