Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

Years divisible by 4 but not by 100 are leap years All other years are not leap

ID: 2327710 • Letter: Y

Question

Years divisible by 4 but not by 100 are leap years All other years are not leap years Execute your program using the years 2196 and 2200 Plot the force function y = 10(1-e^-t/3) over the interval 0 t t_max using a while loop to determine the value of t_max such as y(t_max) = 9.8 Properly label the plot, y is in Newtons, and t in seconds Composition of aluminum alloys Determine how much raw material is needed to produce 10000 tons of each alloy If Zinc cost $3000/ton, what is the total amount spent on Zinc?

Explanation / Answer

Considering Alloy 1, Alloy 356.0

Mg is 0.3 % & Si = 7 %, Remaining is Aluminium, Al = 100 - 0.3 - 7 = 92.7 %

So, to Create 100 tons of Alloy1,

Mg required = 0.3 ton,

Si required = 7 ton &

Al required = 92.7 ton   

and, for producing 10,000 tons of alloy 1,

Mg required = 30 ton,

Si required = 700 ton &

Al required = 9270 ton   

>>

Considering Alloy 2, Alloy 7005

Mg is 1.4 % & Zn = 4.5 %, Remaining is Aluminium, Al = 100 - 1.4 - 4.5 = 94.1 %

So, to Create 100 tons of Alloy2,

Mg required = 1.4 ton,

Zn required = 4.5 ton &

Al required = 94.1 ton   

and, for producing 10,000 tons of alloy 2,

Mg required = 140 ton,

Zn required = 450 ton &

Al required = 9410 ton

>>

Considering Alloy 3, Alloy 7075

Cu = 1.6 %, Mg is 2.5 % & Zn = 5.6 %, Remaining is Aluminium, Al = 100 - 1.6 - 2.5 - 5.6 = 90.3 %

So, to Create 100 tons of Alloy3,

Cu required = 1.6 ton

Mg required = 2.5 ton,

Zn required = 5.6 ton &

Al required = 90.3 ton   

and, for producing 10,000 tons of alloy 3,

Cu required = 160 ton

Mg required = 250 ton,

Zn required = 560 ton &

Al required = 9030 ton   

>> So total raw material required is sum of raw material required in each alloy

=> Total Cu Required = 160 ton

=> Total Mg Required = 30 + 140 + 250 = 420 ton

=> Total Si Required = 700 ton

=> Total Zn Required = 450 + 560 = 1010 ton

=> Total Al Required = 9270 + 9410 + 9030 = 27710 ton ........ANSWER.......PART(a)..................

>> Part (b).

Zn costs $3000/ton

and total Zn required = 1010 ton

So, total cost = 3000*1010 = $3030*103 .......ANSWER.......PART(b)..................