Question
al costing system with labor hours as the cost driver but is preparation for the possible switch, Bunker has identified two activity cost pools: materials handling and setup. Pertinent data follow: Case Leather Case 8,000 899 102 551 Total estimated overhead costs are $224,650, of which $181250 is assigned to the materials handing cost pool and $43,400 is assigned to the setup cost pool Required: 1. Calculate the overhead assigned to the fabric case using the traditional costing system based on direct labor hours. (Do not round intermediate calculations and round your final an S 152,762 2. Calculate the overhead assigned to the fabric case using ABC. (Round activity rates or activity proportions, s 73,625 3. Was the fabric case over- or undercosted by the traditional cost system compared to ABc? O Type here to searchExplanation / Answer
Dear Student Thank you for using Chegg Please find below the answer Statementshowing Computations 1) Overhead assigned to fabric= 17,000/25,000 *224,650 152,762.00 2) Overhead assigned to fabric case 80,655.00 3) Overapplied overhead = 152,762 - 80,655 72,107.00 Refer Below workings for above answer Particulars Amount a Activity Driver No of Activity b Activity Rate No of Activity of Fabric case d Cost Allocated to Fabric case c*d No of Activity of Leather case e Cost Allocated to Leather case c*e Material Handling 181,250.00 No of material moves 1,450.00 125.00 551.00 68,875.00 899.00 112,375.00 Setupcost pool 43,400.00 No of setups 140.00 310.00 38.00 11,780.00 102.00 31,620.00 Total Overhead 224,650.00 80,655.00 143,995.00
Related Questions
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.