E4-13 Assigning Costs Using Treditional System, ABC System [LO 41, 43,44,45,46 t
ID: 2330307 • Letter: E
Question
E4-13 Assigning Costs Using Treditional System, ABC System [LO 41, 43,44,45,46 two actihity cost pools: materials handing and setup. Pertinent data follow: 12,000 667 52 Total estimated overhead costs are $135,000, of which $115,000 is assigned to the materials handling cost pool and $20,000 is assigned to the setup cost pocl. 1. Calculate the overhead assigned to the leather case line using the traditional $ 152,762 2. Calculate the overhead assigned to the leather case line using ABC S 80,655 Over-casted O Type here to searchExplanation / Answer
Dear Student Thank you for using Chegg Please find below the answer Statementshowing Computations 1) Overhead assigned to fabric= 12,000/20,000 *135,000 81,000.00 2) Overhead assigned to fabric case 55,300.00 3) Overapplied overhead = 81,000 - 55,300 25,700.00 Refer Below workings for above answer Particulars Amount a Activity Driver No of Activity b Activity Rate No of Activity of Fabric case d Cost Allocated to Fabric case c*d No of Activity of Leather case e Cost Allocated to Leather case c*e Material Handling 115,000.00 No of material moves 1,150.00 100.00 483.00 48,300.00 667.00 66,700.00 Setupcost pool 20,000.00 No of setups 80.00 250.00 28.00 7,000.00 52.00 13,000.00 Total Overhead 135,000.00 55,300.00 79,700.00
Related Questions
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.