M4-10 Assigning Costs Using Activity Proportions [LO 4-5] Lakeside Inc. manufact
ID: 2337780 • Letter: M
Question
M4-10 Assigning Costs Using Activity Proportions [LO 4-5] Lakeside Inc. manufactures four lines of remote control boats and uses activity-based costing to calculate product cost. Estimated Total Cost S329,000 13,500 machine hours Activity Cost Pools Machining Setup Quality control Estimated Cost Driver batches 66,000 400 03,000870 870 inspections Suppose the Luxury boat requires 4,550 machine hours, 165 inspections, and 56 batches. Using activity proportions, determine the amount of overhead assigned to the Luxury product line Round your intermediate calculations to the nearest whole percentage and your final answer to the nearest whole number.) Cost Pool Machining Setup Costs Quality Control Total Overhead Allocated Overhe SExplanation / Answer
Particulars Amount a Activity Driver No of Activity b Cost per activity c= a/b Machining 329,000.00 Machine hours 13,500.00 24.37 Setup 66,000.00 Batches 400.00 165.00 Quality Control 103,000.00 Inspections 870.00 118.39 Total Overhead 498,000.00 Cost Pool Allocated overhead Machining = 4550 *24.37 110,883.50 Setup costs = 56*165 9,240.00 Qualit Control = 165 *118.39 19,534.35 Total Overhead 139,657.85
Related Questions
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.