1. If a production assembly line bottlenecks at the packaging station, managemen
ID: 2350133 • Letter: 1
Question
1. If a production assembly line bottlenecks at the packaging station, management should apply the Lean approach.
Answer Agree. Management should cut down the length of waiting lines (i.e., make the lines more lean).
Disagree. Management should focus on the Theory of Constraints.
Question 11
Which of the following costs is an example of a period rather than a product cost?
Answer Depreciation on production equipment.
Wages of salespersons.
Wages of production machine operators.
Insurance on production equipment.
.
3 points
Question 12
Variable cost:
Answer increases on a per unit basis as the number of units produced increases.
remains constant on a per unit basis as the number of units produced increases.
remains the same in total as production increases.
decreases on a per unit basis as the number of units produced increases.
Question 19
Maintenance costs at a Tierce Corporation factory are listed below:
Machine-Hours Maintenance Cost
January
Explanation / Answer
Management should cut down the length of waiting lines Wages of salespersons. emains constant on a per unit basis as the number of units produced $0.11 per machine-hour; $52,591 per month