Kraus Industries Inc. manufactures recreational vehicles. Kraus uses a job order cost system. The time tickets from July jobs are summarized below.

Job 501 $4200

Job 502 3,200

Job 503 2,870

Job 504 3,650

Factory supervision 2,450

Factory overhead is applied to jobs on the basis of a predetermined overhead rate of $12 per direct labor hour. The direct labor rate is $30 per hour.



a. Journalize the entry to record the factory labor costs. If an amount box does not require an entry, leave it blank or enter zero ("0").

Work in process

factory overhead

Wages payable




b. Journalize the entry to apply factory overhead to production for July.

Work in process

Factory overhead

Explanation / Answer

a. Journalize the entry to record the factory labor costs. If an amount box does not require an entry, leave it blank or enter zero ("0"). Work in process DEBIT 13920 factory overhead DEBIT 2450 Wages payable CREDIT 16370 b. Journalize the entry to apply factory overhead to production for July. Work in process DEBIT 5568 (13920/30*12) Factory overhead CREDIT 5568