Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

Activity-Based, Costing Hercules Industries manufactures two types of electrical

ID: 2356480 • Letter: A

Question

Activity-Based, Costing Hercules Industries manufactures two types of electrical power units, custom and standard, which involve four overhead activities-production setup, procurement, quality control, and materials management. An activity analysis of the overhead revealed the following estimated costs and activity bases for these activities: The activity-base usage quantities for each product are as follows: Determine an activity rate for each activity. Assign activity costs to each product, and determine the unit activity cost using the activity rates from part (a). Round unit costs to the nearest cent. Assume that each product required one direct labor hour per unit. Determine the per unit cost if factory overhead is allocated on the basis of direct labor hours. Round your answer to the nearest cent. Explain why the answers in parts (b) and (c) are different. The input in the box below will not be graded, but may be reviewed and considered by your instructor.

Explanation / Answer

Posters rating is not 100%. Hence Pl dont answer this post as this person has been irresponsible in rating answers. So he don't deserve any solutions here. First make him rate all pending posts truthfully & also pledge that he will rate all answers within 2 days to be eligible for help from Educators & others. Till such time, just ignore all posts where rating is not 100%. This will make Cramster a better forum to contribute. Amen... Pl goto http://www.cramster.com/my_cramster/questions-and-answers/NeedRatingQuestions & rate your pending posts

Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
Chat Now And Get Quote