PROBLEM 6-12. Activity-Based Costing [LO 5] The Cheesecake Shoppe is a national

ID: 2418069 • Letter: P

Question

PROBLEM 6-12. Activity-Based Costing [LO 5] The Cheesecake Shoppe is a national bakery that is known for its strawberry cheesecake.It makes 12 different kinds of cheesecake as well as many other types of bakery items. It has recently adopted an activity-based costing system to assign manufacturing overhead to products.The following data relate to its strawberry cheesecake and the ABC cost pools:

Strawberry Cheesecake:

Annual production                 19,500 units

Direct materials per unit            $10

Direct labor per unit                   $2

Cost Pool                                       Cost                           Cost Driver

Materials ordering                       $ 72,000             Number of purchase orders

Materials inspection                       75,000             Number of receiving reports

Equipment setup                          105,000             Number of setups

Quality control                                69,000             Number of inspections

Other                                            100,000             Direct labor cost

Total manufacturing overhead     $421,000

Annual activity information related to cost drivers:

Cost Pool                        All Products              Strawberry Cheesecake

Materials ordering          8,000 orders                            100

Materials inspection      375 receiving reports                 60

Equipment setup            3,000 setups                             30

Quality control                3,000 inspections                    150

Other                        $2,000,000 direct labor           $39,000

Required

a. Calculate the overhead rate per unit of activity for each of the ve cost pools.

b. Calculate the total overhead assigned to the production of the strawberry cheesecake.

c. Calculate the overhead cost per unit for the strawberry cheesecake.Round to three decimal places.

d. Calculate the total unit cost for the strawberry cheesecake. Round to three decimal places.

e. Suppose that the Cheesecake Shoppe allocates overhead by a traditional production volume-based method using direct labor dollars as the allocation base and one cost pool. Determine the overhead rate per direct labor dollar and the per unit overhead assigned to the strawberry cheesecake.Discuss the difference in cost allocations between the traditional method and the activity-based costing approach. Round to three decimal places.

Explanation / Answer

a and b) Cost Pool Cost Cost driver No of Activity Cost per Activity Strawberry Cheese cake activity Cost of strawberry cheesecake Materials Ordering                      72,000.00 No of repurchase orders                        8,000.00                             9.00                       100.00                       900.00 Material Inspection                      75,000.00 No of receiving reports                            375.00                         200.00                         60.00                 12,000.00 Equipment Set up                    105,000.00 No of setups                        3,000.00                           35.00                         30.00                    1,050.00 Quality Control                      69,000.00 No of inspections                        3,000.00                           23.00                       150.00                    3,450.00 Other                    100,000.00 Direct Labour Cost                2,000,000.00                             0.05                 39,000.00                    1,950.00                    421,000.00                 19,350.00 c) Overhead Cost of strawberry cheesecake                      19,350.00 No of units                      19,500.00 Cost per unit                                 0.99 d) Statement showing computations Particulars Amount DM per unit                              10.00 DL per unit                                 2.00 Overhead Cost per unit                                 0.99 Total Cost per unit                              12.99 e) Total Manu O/H                    421,000.00 Total Direct Labour                2,000,000.00 O/H per Dl hour                            0.2105 Total O/H Allocated to StrawberryCheese cake = .2105 *39000                        8,209.50