Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

Zoey, Inc. uses an activity-based cost system. The following ABC rates have alre

ID: 2429526 • Letter: Z

Question

Zoey, Inc. uses an activity-based cost system.

The following ABC rates have already been calculated.


Job 317 has the following inputs.

35 direct labor hours (the direct labor rate is $25 per hour)

30 pounds of materials (the material cost is $5 per pound)

8 setups

12 machine hours

A. Enter the total amount of overhead applied to this job.

B. Compute the total cost of the job, including overhead.

  Overhead pools Activity rate   Pool A............ $5 per direct labor hour   Pool B............ $1000 per setup Pool C........... $2 per machine hour

Explanation / Answer

A POOL A 175 =35*5 POOL B 8000 =1000*8 POOL C 24 =2*12 Total amount of overhead applied 8199 B Direct materials 150 =30*5 Direct labor 875 =35*25 Overhead 8199 Total cost of the job 9224