DataSpan, Inc., automated its plant at the start of the current year and install

ID: 2436212 • Letter: D

Question

DataSpan, Inc., automated its plant at the start of the current year and installed a flexible manufacturing system. The company is also evaluating its suppliers and moving toward Lean Production. Many adjustment problems have been encountered, including problems relating to performance measurement. After much study, the company has decided to use the performance measures below, and it has gathered data relating to these measures for the first four months of operations.

Management has asked for your help in computing throughput time, delivery cycle time, and MCE. The following average times have been logged over the last four months:


Required:

1- Compute the throughput time for each month. Compute the delivery cycle time for each month. Compute the manufacturing cycle efficiency (MCE) for each month.

2. Evaluate the company’s performance over the last four months.

3-a. Refer to the move time, process time, and so forth, given for month 4. Assume that in month 5 the move time, process time, and so forth, are the same as in month 4, except that through the use of Lean Production the company is able to completely eliminate the queue time during production. Compute the new throughput time and MCE.

3-b. Refer to the move time, process time, and so forth, given for month 4. Assume in month 6 that the move time, process time, and so forth, are again the same as in month 4, except that the company is able to completely eliminate both the queue time during production and the inspection time. Compute the new throughput time and MCE.

Month 1 2 3 4 Throughput time (days) ? ? ? ? Delivery cycle time (days) ? ? ? ? Manufacturing cycle efficiency (MCE) ? ? ? ? Percentage of on-time deliveries 82 % 77 % 74 % 71 % Total sales (units) 2100 2010 1907 1835

Explanation / Answer

1-a

Throughput time

1

2

3

4

Throughput Time in days

Process time

2.3

2.2

2.1

2

Inspection time

0.8

1.1

1.1

0.8

Move time

0.6

0.3

0.4

0.4

Queue time

4.7

5.5

6.4

7.4

Total throughput time

8.4

9.1

10

10.6

1-b

Delivery cycle time for each month

Wait time

20

21.9

26

28

Throughput time

8.4

9.1

10

10.6

Total delivery cycle time

28.4

31

36

38.6

1-c

Manufacturing Cycle efficiency

Process time/Throughput time

27.4%

24.2%

21.0%

18.9%

Throughput

Delivery cycle

MCE

Month 1

8.4

days

28.4

days

27.4%

%

Month 2

9.1

days

31

days

24.2%

%

Month 3

10

days

36

days

21.0%

%

Month 4

10.6

days

38.6

days

18.9%

%

2

The Throughput time measure dispalays

Increasing

trends

The Delivery cycle time days measure displays

Increasing

trends

Manufacturing Cycle efficiecy Days measure dispalys

Declining

trends

3-a and 3b

5

6

Throughput time in days

Process time

2

2

Inspection time

0.8

0

Move time

0.4

0.4

Total throughput time

3.2

2.4

MCE

62.50%

83.33%

Throughput

MCE

Month 5

3.2

days

62.50%

%

Month 6

2.4

days

83.33%

%

1-a

Throughput time

1

2

3

4

Throughput Time in days

Process time

2.3

2.2

2.1

2

Inspection time

0.8

1.1

1.1

0.8

Move time

0.6

0.3

0.4

0.4

Queue time

4.7

5.5

6.4

7.4

Total throughput time

8.4

9.1

10

10.6

1-b

Delivery cycle time for each month

Wait time

20

21.9

26

28

Throughput time

8.4

9.1

10

10.6

Total delivery cycle time

28.4

31

36

38.6

1-c

Manufacturing Cycle efficiency

Process time/Throughput time

27.4%

24.2%

21.0%

18.9%

Throughput

Delivery cycle

MCE

Month 1

8.4

days

28.4

days

27.4%

%

Month 2

9.1

days

31

days

24.2%

%

Month 3

10

days

36

days

21.0%

%

Month 4

10.6

days

38.6

days

18.9%

%