DataSpan, Inc., automated its plant at the start of the current year and install
ID: 2436212 • Letter: D
Question
DataSpan, Inc., automated its plant at the start of the current year and installed a flexible manufacturing system. The company is also evaluating its suppliers and moving toward Lean Production. Many adjustment problems have been encountered, including problems relating to performance measurement. After much study, the company has decided to use the performance measures below, and it has gathered data relating to these measures for the first four months of operations.
Management has asked for your help in computing throughput time, delivery cycle time, and MCE. The following average times have been logged over the last four months:
Required:
1- Compute the throughput time for each month. Compute the delivery cycle time for each month. Compute the manufacturing cycle efficiency (MCE) for each month.
2. Evaluate the company’s performance over the last four months.
3-a. Refer to the move time, process time, and so forth, given for month 4. Assume that in month 5 the move time, process time, and so forth, are the same as in month 4, except that through the use of Lean Production the company is able to completely eliminate the queue time during production. Compute the new throughput time and MCE.
3-b. Refer to the move time, process time, and so forth, given for month 4. Assume in month 6 that the move time, process time, and so forth, are again the same as in month 4, except that the company is able to completely eliminate both the queue time during production and the inspection time. Compute the new throughput time and MCE.
Month 1 2 3 4 Throughput time (days) ? ? ? ? Delivery cycle time (days) ? ? ? ? Manufacturing cycle efficiency (MCE) ? ? ? ? Percentage of on-time deliveries 82 % 77 % 74 % 71 % Total sales (units) 2100 2010 1907 1835Explanation / Answer
1-a
Throughput time
1
2
3
4
Throughput Time in days
Process time
2.3
2.2
2.1
2
Inspection time
0.8
1.1
1.1
0.8
Move time
0.6
0.3
0.4
0.4
Queue time
4.7
5.5
6.4
7.4
Total throughput time
8.4
9.1
10
10.6
1-b
Delivery cycle time for each month
Wait time
20
21.9
26
28
Throughput time
8.4
9.1
10
10.6
Total delivery cycle time
28.4
31
36
38.6
1-c
Manufacturing Cycle efficiency
Process time/Throughput time
27.4%
24.2%
21.0%
18.9%
Throughput
Delivery cycle
MCE
Month 1
8.4
days
28.4
days
27.4%
%
Month 2
9.1
days
31
days
24.2%
%
Month 3
10
days
36
days
21.0%
%
Month 4
10.6
days
38.6
days
18.9%
%
2
The Throughput time measure dispalays
Increasing
trends
The Delivery cycle time days measure displays
Increasing
trends
Manufacturing Cycle efficiecy Days measure dispalys
Declining
trends
3-a and 3b
5
6
Throughput time in days
Process time
2
2
Inspection time
0.8
0
Move time
0.4
0.4
Total throughput time
3.2
2.4
MCE
62.50%
83.33%
Throughput
MCE
Month 5
3.2
days
62.50%
%
Month 6
2.4
days
83.33%
%
1-a
Throughput time
1
2
3
4
Throughput Time in days
Process time
2.3
2.2
2.1
2
Inspection time
0.8
1.1
1.1
0.8
Move time
0.6
0.3
0.4
0.4
Queue time
4.7
5.5
6.4
7.4
Total throughput time
8.4
9.1
10
10.6
1-b
Delivery cycle time for each month
Wait time
20
21.9
26
28
Throughput time
8.4
9.1
10
10.6
Total delivery cycle time
28.4
31
36
38.6
1-c
Manufacturing Cycle efficiency
Process time/Throughput time
27.4%
24.2%
21.0%
18.9%
Throughput
Delivery cycle
MCE
Month 1
8.4
days
28.4
days
27.4%
%
Month 2
9.1
days
31
days
24.2%
%
Month 3
10
days
36
days
21.0%
%
Month 4
10.6
days
38.6
days
18.9%
%