Computing Job Costs (LO – 4-3) Weaver Company’s predetermined overhead rate is $
ID: 2458902 • Letter: C
Question
Computing Job Costs (LO – 4-3)
Weaver Company’s predetermined overhead rate is $18.00 per direct labor-hour and its direct labor wage rate is $12.00 per hour. The following information pertains to Job A-200.
Direct Materials ………………………………. $200
Direct Labor …………………………………….. $120
Required:
What is the total manufacturing cost assigned to Job a-200?
If Job A-200 consists of 50 units, what is the average cost assigned to each unit included in the job?
Direct Materials ………………………………. $200
Direct Labor …………………………………….. $120
Explanation / Answer
Total manufacturing cost assigned to Job a-200
Direct materials $200
Direct Labour $120
Overheads $180
Total manufacturing costs $500
Overheads = $18 per direct labour hours
Labour hours = Direct labour costs / wage rate = 120 / 12 = 10
so, overheads = 18* 10 = $180
If Job A-200 consists of 50 units, average cost assigned to each unit included in the job
$500 per unit
Related Questions
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.