Benoist Corporation has an activity-based costing system with three activity cos
ID: 2466132 • Letter: B
Question
Benoist Corporation has an activity-based costing system with three activity cost pools-Machining, Setting Up, and Other. The company's overhead costs have already been allocated to the cost pools and total $17,200 for the Machining cost pool, $7,700 for the Setting Up cost pool, and S52,100 for the Other cost pool Costs in the Machining cost pool are assigned to products based on machine-hours (MHs) and costs in the Setting Up cost pool are assigned to products based on the number of batches. Costs in the Qther cost pool are not assigned to products. Data concerning the two products and the company's costs appear below MHs Batches 300 700 20,000 1000 7,300 12,700 Product O7.. Product O1 Sales (total Direct materials (total) Direct labor (total) Product O7 Product O1 $226,000 $142,000 $75,200 $46,600 $98,300 $107,300 Required: Answer the following questions. Show your calculations a. Calculate activity rates for each activity cost pool using activity-based costingExplanation / Answer
Answer:1
Answer:2
Answer:3
Activity cost pool cost Basis No. of Activity Activity rate Machining 17200 Mchine hours 20000 0.86 Setting up 7700 No. of batches 1000 7.7 Other 52100 Total 77000Related Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.