National Technology, LTD. Has developed the following activity cost information for its manufacturing activities:

   Activity

Activity Cost

Machine setup

$65.00 per batch

Movement

15.00 per batch move

    0.10 per pound

Drilling

    4.00 per hole

Welding

    4.00 per hour

Shaping

25.00 per hour

Assembly

17.00 per hour

Inspection

    2.00 per unit

Filling an order for a batch of 50 fireplace inserts that weighed 150 pounds each required the following:

Three batch moves

Two sets of inspections

Drilling five holes in each unit

Completing 80 inches of welds in each unit

Thirty minutes of shaping for each unit

One hour of assembly per unit

Required:                                                                                                                                 

Determine the activity cost of converting the raw materials into 50 fireplace inserts.

   Activity

Activity Cost

Machine setup

$65.00 per batch

Movement

15.00 per batch move

    0.10 per pound

Drilling

    4.00 per hole

Welding

    4.00 per hour

Shaping

25.00 per hour

Assembly

17.00 per hour

Inspection

    2.00 per unit

Explanation / Answer

   Activity Calculation Amount in $ Remarks Machine setup 65 $                                                                   65.00 Nothing mentioned about number of batches so it is assumed it as one batch to make 50 units Movement 3*15 $                                                                   45.00 Movement 150*50*0.10 $                                                                 750.00 Drilling 50*5*4 $                                                             1,000.00 Welding 4*80*50 $                                                           16,000.00 It seems that it is wrongly mentioned as $4 per hour instead of $4 per inches. So here calculation done as per $4 per inches Shaping 25*(30/60)*50 $                                                                 625.00 Assembly 17*1*50 $                                                                 850.00 Inspection 2*50*2 $                                                                 200.00 activity cost of converting the raw materials into 50 fireplace inserts $                                                           19,535.00