The Electrotech Corporation manufactures two industrial-sized electrical devices
ID: 2475683 • Letter: T
Question
The Electrotech Corporation manufactures two industrial-sized electrical devices: generators and alternators. Both of these products require wiring and testing during the assembly process. Each generator requires 2 hours of wiring and 1 hour of testing and can be sold for a $250 profit. Each alternator requires 3 hours of wiring and 2 hours of testing and can be sold for a $150 profit. There are 260 hours of wiring time and 140 hours of testing time available in the next production period, and Electrotech wants to maximize profit. Formulate a linear programming model for this problem (note: you don’t need to solve it).
Explanation / Answer
Let "X" be the number of generator sold and "Y" be the alternator sold
Maximize Z = 250X + 150 Y
Also,
2X +3 Y < = 260 [<= IT MEAns less than or equal to ]
1X + 2Y <= 140
X and Y > = 0
Related Questions
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.