Trico Company set the following standard unit costs for its single product. Direct materials (23 lbs. $4.60 per lb.) Direct labor (5 hrs. @ $7.70 per hr.) Factory overhead-variable (5 hrs. @ $5.80 per hr.) Factory overhead-fixed (5 hrs. @ $7.40 per hr.) 105.80 38.50 29.00 37.00 Total standard cost $210.30 The predetermined overhead rate is based on a planned operating volume of 80% of the productive capacity of 66,000 units per quarter. The following flexible budget information is available Operating Levels 70% 46,200 231,000 90% Production in units Standard direct labor hours Budgeted overhead 52,800 264,000 59,400 297,000 Fixed factory overhead Variable factory overhead $1,953,600 $1,953,600 $ 1,953,600 $1,339,800 $1,531,200 $ 1,722,600 During the current quarter, the company operated at 70% of capacity and produced 46,200 units of product; actual direct labor totaled 229,900 hours. Units produced were assigned the following standard costs Direct materials (1,062,600 lbs. $4.60 per lb.) Direct labor (231,000 hrs. @ $7.70 per hr.) Factory overhead (231,000 hrs. $13.20 per hr.) $4,887,960 1,778,700 3,049,200 Total standard cost $ 9,715,860

Explanation / Answer

Answer:a)

Variable overhead spending variance = AH (SR - AR)

= 229900 [ $5.80 - (1298935/229900)]

= 229900($5.80 - $5.65)

= $34485 F

Variable overhead efficiency variance = SR ( SH - AH)

=$5.80 ( 231000 - 229900)

= $6380 F

Answer: b)

Fixed overhead spending variance = AH (SR - AR)

= 229900 [$7.40 - (1900600/229900)]

= 229900($7.40 - $8.27)

= $200013 U

Fixed overhead volume variance = SR ( SH - AH)

= $7.40 (231000 - 264000)

= $244200 U

Answer:c)

Total variable overhead variance = $34485 F+$6380 F = $40865 F

Total Fixed overhead variance = $200013 U+$244200 U= $444213 U

Total overhead controllable variance = $444213 U+$40865 F= $403348 U