Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

J. Ietbrd the yournal entry for the exchange of assets on March 15, 2018. Assume

ID: 2549900 • Letter: J

Question

J. Ietbrd the yournal entry for the exchange of assets on March 15, 2018. Assume the > Problems Group A Determining asset cost and recording partial-year straight-line P9-30A Discount Parking, near an airport, incurred the following costs to acquire land, make land improvements, and construct and furnish a small building Purchase price of three acres of land 80,000 a. b. Delinquent real estate taxes on the land to be paid by Discount Parking. c. Additional dirt and earthmoving d. Title insurance on the land acquisition e. Fence around the boundary of the property f. Building permit for the building g. Architect's fee for the design of the building h. Signs near the front of the property i. Materials used to construct the building j. Labor to construct the building k. Interest cost on construction loan for the building I. Parking lots on the property m. Lights for the parking lots n. Salary of construction supervisor (80% to building: 20% to parking lot 6,300 9,000 3,200 9,600 1,000 20,700 9,300 215,000 175,000 9,400 28,500 11,200 50,000 and concrete walks) o. Furniture p. Transportation of furniture from seller to the building q. Additional fencing 11,200 2,200 6,600 Discount Parking depreciates land improvements over 15 years, buildings over 40 years, and furniture over 10 years, all on a straight-line basis with zero residual value.

Explanation / Answer

1.

2.

S.No. Land Land Improvements Building Furniture a Purchase cost of the land 80000 b Delinquent real estate taxes 6300 c Additional dirt and earth removing 9000 d Title insurance on the land acquisition 3200 e Fence around the boundary of the property 9600 f Building permit for the building 1000 g Architect's fee fr the design of the building 20700 h Sign near the front of the property 9300 i Materials used to construct the building 215000 j Labor to construct the building 175000 k Interest cost on loan to construct the building 9400 l Parking lots on the property 28500 m Lights for the parking lot 11200 n Salary of constructionsupervisor 10000 40000 o Furniture 11200 p Transportation of furniture from the seller 2200 q Addtional Fencing 6600 Total 99100 74600 461100 13400