Monique’s Florals produced a special Mother’s Day arrangement that included eigh
ID: 2558783 • Letter: M
Question
Monique’s Florals produced a special Mother’s Day arrangement that included eight roses. The standard and actual costs of the roses used in each arrangement follow:
Monique’s Florals planned to make 750 arrangements but actually made 790.
Required
Determine the total flexible budget materials variance and indicate whether it is favorable (F) or unfavorable (U).
Determine the materials price variance and indicate whether it is favorable (F) or unfavorable (U).
Determine the materials usage variance and indicate whether it is favorable (F) or unfavorable (U).
Confirm the accuracy of Requirements a, b, and c by showing that the sum of the price and usage variances equals the total variance.
Standard Actual Average number of roses per arrangement 8.0 8.25 Price per rose × $ 0.50 × $ 0.48 Cost of roses per arrangement $ 4.00 $ 3.96Explanation / Answer
Total flexible budget materials variance=(790*3.96)-(790*4)= $31.6 F Materials price variance=790*8.25*(0.48-0.5)= $130.35 F Materials usage variance=0.5*(790*8.25-790*8)= $98.75 U Sum of the price and usage variances=130.35-98.75=$31.6 F