0. A manufacturing company uses a standard costing system in which standard mach
ID: 2559518 • Letter: 0
Question
0.
A manufacturing company uses a standard costing system in which standard machine-hours (MHs) is the measure of activity. Data from the company's flexible budget for manufacturing overhead are given below:
The following data pertain to operations for the most recent period:
The fixed manufacturing overhead budget variance for the period is closest to:
$3,916 U
$3,900 F
$646 F
$1,070 F
11.
A manufacturing company uses a standard costing system in which standard machine-hours (MHs) is the measure of activity. Data from the company's flexible budget for manufacturing overhead are given below:
The following data pertain to operations for the most recent period:
The overhead applied to products during the period was closest to: (Do not round intermediate calculations. Round your answer to the nearest dollar amount.)
$124,620
$124,322
$120,900
$121,880
A manufacturing company uses a standard costing system in which standard machine-hours (MHs) is the measure of activity. Data from the company's flexible budget for manufacturing overhead are given below:
Explanation / Answer
Ans. Fixed overhead Budget Variance = Fixed Overhead Budgeted-Actual Fixed Overhead
= $85800-$84730 = $1070 (F)
2. Calculation of Overhead applied to actual production as per standard costing
Variable overhead applied = $31680/6500 = 4.87X6684 =$32551
Fixed overhead applied = $89220/6500 = 13.73X6684=$91771
total factory overhead applied = $124322