Swift Boat Corporation uses a job order cost system and applies overhead based o
ID: 2578100 • Letter: S
Question
Swift Boat Corporation uses a job order cost system and applies overhead based on a percentage of direct Use the following to answer questions 43-45 given below given abr cost. Cost flows through the Work in Process Inventory account during March are Work in Process 240,000 Transferred Out Beginning Balance Direct Materials Direct Labor Overhead 45,000 75,000 225,000 Ending Balance 105,000 Sas%00hn 0i7 wan stl ia procs at thed of March and this job had been charged with Refer to the information above. The amount of direct materials cost charged to completed jobs during March was: A) $15,000. B) $45,000. C) $30,000. 43. Some other amount. D) Refer to the information above. The predetermined overhead application rate at Swift Boat is what percentage of direct labor costs? 44. A) 33%. B) 67%. C) 30096. D) 400%. 45 Refer to the information above. The amount of overhead costs applied to Job #007 during March were: A) $90,000. B) S26,250. C) $67,500. D) $60,000. 46. A job order cost system would be appropriate in the manufacture of A) Paints. B) Custom-made furniture. C) Breakfast cereal. D) Standard-grade plywood.Explanation / Answer
43. Answer is C
Total direct materials charged $45,000
Less: Direct materials charged for Job #007 $15,000
Direct material chared for completed jobs $30,000
44. Answer is C
Overhrad applied $225,000
Direct balor charged $75,000
Rate at which overhead was applied $225,000 / $75,000 = 300%
45. Answer is C
Ending balance 9total cost of job#007) $105,000
Material charged for job#007 $15,000
Direct labor + overheads for job#007 $90,000
Overheads are 300% of direct labor.
Direct labor + 3 times direct labor for Job #007 =$90,000
Direct labor for Job#007 = 90,000 / 4 = $22,500
Overheads for Job#007 = 3 x 22,500 = $67,500
46. Answer is B
Related Questions
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.