Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

step by step instruction 8.5 Post Card Depot, an large retailer of post cards, o

ID: 2647855 • Letter: S

Question

step by step instruction

8.5 Post Card Depot, an large retailer of post cards, orders 7,664,874 post cards per year from its manufacturer. Post Card Depot plans on ordering post card 12 times over the next year. Post Card Depot receives the same number of post cards each time it orders. The carrying cost is $0.10 per post card per year. The ordering cost is $49.4 per order. Answer $592.80 8.6 Post Card Depot, an large retailer of post cards, orders 4,431,467 post cards per year from its manufacturer. Post Card Depot plans on ordering post card 15 times over the next year. Post Card Depot receives the same number of post cards each time it orders. The carrying cost is $0.19 per post card per year. The ordering cost is $28.8 per order. Answer $28,065.96

Explanation / Answer

Q 8. 5 Post Card Depot, an large retailer of post cards, orders 7,664,874 post cards per year from its manufacturer. Post Card Depot plans on ordering post card 12 times over the next year. Post Card Depot receives the same number of post cards each time it orders. The carrying cost is $0.10 per post card per year. The ordering cost is $49.4 per order. Required Total Ordering Cost.

Total Ordering Cost = ordering cost per order * No of order

Total Ordering Cost = 49.4* 12

Total Ordering Cost = $ 592.80

Q 8.6 Post Card Depot, an large retailer of post cards, orders 4,431,467 post cards per year from its manufacturer. Post Card Depot plans on ordering post card 15 times over the next year. Post Card Depot receives the same number of post cards each time it orders. The carrying cost is $0.19 per post card per year. The ordering cost is $28.8 per order, Required Total Carrying Cost

Total Carrying Cost = No of Card Ordered * 1/2 * Carrying Cost per card

Total Carrying Cost = 4431467/15 * 1/2 * 0.19

Total Carrying Cost = $28,065.96