Tropical Soft Drinks is evaluating a proposal to install solar panels on the roof of it's factory near San Juan. The panels will cost $150,000 per set. Depending on the price of electricity and the efficiency of the panels, the project will increase operating cash flows by either $50,000 per year or $75,000 per year. The useful life of the panels is 5 years. If early results indicate savings of $75,000 per year, four additional sets of panels will be installed immediately at the same cost with the same projected savings. The probability of either outcome is 50%. Use a discount rate of 10%. What is the expected NPV of the project if the option to expand is considered. A) $671,545 B) $355,542 C) $236,924 D) $711,084

Explanation / Answer

Tropical Soft Drinks is evaluating a proposal to install solar panels on the roof of it's factory near San Juan. The panels will cost $150,000 per set. Depending on the price of electricity and the efficiency of the panels, the project will increase operating cash flows by either $50,000 per year or $75,000 per year. The useful life of the panels is 5 years. If early results indicate savings of $75,000 per year, four additional sets of panels will be installed immediately at the same cost with the same projected savings. The probability of either outcome is 50%. Use a discount rate of 10%. What is the expected NPV of the project if the option to expand is considered.

A) $671,545

B) $355,542

C) $236,924

d) $711,084