1.If a project has more than one negative net cash-flow a problem with using the
ID: 2722939 • Letter: 1
Question
1.If a project has more than one negative net cash-flow a problem with using the IRR method to evaluate the project is that: Select one: a. The cash-flows cannot be determined b. The risk of the project cannot be determined c. The project will have multiple IRRs d. The payback period cannot be determined (Just need the answer , no need process)
2.The periodic cash-flows from an investment in shares are called:Select one:a. Coupons b. Interest c. Capital gains d. Dividends
3.A downward sloping yield curve generally indicates:Select one: a. An expansion in economic activity in the future b. A rise in interest rates in the future c. Unemployment will fall in the future d. A contraction in economic activity in the future
Explanation / Answer
Answer:1 b. The risk of the project cannot be determined
Answer:2 d. Dividends
Answer:3 A contraction in economic activity in the future