Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

An efficiency study conducted for Elektra Electronics showed that the number of

ID: 2858059 • Letter: A

Question

An efficiency study conducted for Elektra Electronics showed that the number of Space Commander walkie-talkies assembled by the average worker during the morning shift t hr after starting work at 8 a.m. is given by N(t) = t3 + 6t2 + 15t (0 t 4).

(a) Find the rate at which the average worker will be assembling walkie-talkies t hr after starting work.

=3t2+12t+15

(b) At what rate will the average worker be assembling walkie-talkies at 10 a.m.?

=27 walkie-talkies/hour

At what rate will the average worker be assembling walkie-talkies at 11 a.m.?

=24 walkie-talkies/hour

(c) How many walkie-talkies will the average worker assemble between 10 a.m. and 11 a.m.?

=??? walkie-talkies

Explanation / Answer

(c) Given that, the number of Space Commander walkie-talkies assembled by the average worker during the morning shift t hr after starting work at 8 a.m. is given by N(t) = t3 + 6t2 + 15t (0 t 4).

Thus, the number of walkie-talkies the average worker will assemble between 10 a.m. and 11 a.m.

=N(3)-N(2) walkie-talkies

putting t=3 in N(t)

N(3)= -27+54+45 = 72

putting t=2 in N(t)

N(2)= -8+24+30 = 46

Thus, N(3) - N(2) = 72-46 = 26.

Thus, the number of walkie-talkies the average worker  will assemble between 10 a.m. and 11 a.m.

=N(3)-N(2) walkie-talkies

=26 walkie-talkies

*******************************

Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
Chat Now And Get Quote