Manual without using the computer
Question (B5) The Turned-On Transistor Radio Company manufacturers Models A, B, and C which have profit contributions of 8, 15, and 25, respectively. The weekly minimum production requirements are 100 for model A, 150 for Model B, and 75 for Model C. Each type of radio requires a certain amount of time for the manufacturing of component parts, for assembling and for packaging Specifically, a dozen units of Model A require three hours for manufacturing, four hours for assembling and one hour for packaging. The corresponding figures for a dozen units of Model B are 3.5, 5, and 1.5, and for a dozen units of Model C are 5, 8, and 3. During the forthcoming week, the company has available 150 hours of manufacturing, 200 hours of assembling and 60 hours of packaging time. Formulate the production scheduling problem as a linear programming modelExplanation / Answer
Maximize 8x+15y+25z
s.t
x>=100,y>=150,z>=75
3x+3.5y+5z<=150*12
4x+5y+8z<=200*12
1x+1.5y+3z<=60*12
Related Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.