Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

An article on estimating 28-day strength of concrete considered regressing y = 2

ID: 3156119 • Letter: A

Question

An article on estimating 28-day strength of concrete considered regressing y = 28-day standard-cured strength (psi) against x = accelerated strength (psi). Suppose the equation of the true regression line is y = 1830 + 1.1x.

(a) What is the expected value of 28-day strength when accelerated strength = 2480?

(b) By how much can we expect 28-day strength to change when accelerated strength increases by 1 psi?

(c) By how much can we expect 28-day strength to change when accelerated strength increases by 70 psi?

(d) By how much can we expect 28-day strength to change when accelerated strength decreases by 70 psi?

Explanation / Answer

(a)The expected value of 28-day strength when accelerated strength = 2480 is:

y=1830+1.1*2480

=4558

(b)The 28-day strength is expected to change when accelerated strength increases by 1 psi is 1.1.

Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
Chat Now And Get Quote