Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

Modify Model 3-1 with all of the following changes in the same single model (not

ID: 3162174 • Letter: M

Question

Modify Model 3-1 with all of the following changes in the same single model (not three separate models). Put a text box in your model with your results on the number of parts that both pass and fail inspection (which you can just read off of your final "frozen" animation), and at the inspection center, the average and maximum time in queue, the average and maximum queue length, and the utilization of the inspector resource. To help format your text box, choose the Courier New font in it; you might want to use Notepad or another plan-text editor (not word-processing software) to compose your text-box contents, then copy/paste them into the Arena text box.

Explanation / Answer

Solution :-

Interarrivals: expo (10) min

From the starting arrival point, need to go to Part A Prep

Process = (deburr + clean+ machine + ) ~ tria (1,4,8) min.

Go to Sealer

Then Process = ( test + assemble) ~ tria (1,3,4) min.

95% pass, go immediately to Shipped; Else go to Rework

Rework: (again testing+ re-process) ~ expo (45) min.

85% pass, go immediately to Salvaged; Else go to Scrappe

Run:- Start it empty & idle, and minimum run for 35 hour

Then execute it competely.

Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
Chat Now And Get Quote