Modify Model 3-1 with all of the following changes in the same single model (not
ID: 3162174 • Letter: M
Question
Modify Model 3-1 with all of the following changes in the same single model (not three separate models). Put a text box in your model with your results on the number of parts that both pass and fail inspection (which you can just read off of your final "frozen" animation), and at the inspection center, the average and maximum time in queue, the average and maximum queue length, and the utilization of the inspector resource. To help format your text box, choose the Courier New font in it; you might want to use Notepad or another plan-text editor (not word-processing software) to compose your text-box contents, then copy/paste them into the Arena text box.Explanation / Answer
Solution :-
Interarrivals: expo (10) min
From the starting arrival point, need to go to Part A Prep
Process = (deburr + clean+ machine + ) ~ tria (1,4,8) min.
Go to Sealer
Then Process = ( test + assemble) ~ tria (1,3,4) min.
95% pass, go immediately to Shipped; Else go to Rework
Rework: (again testing+ re-process) ~ expo (45) min.
85% pass, go immediately to Salvaged; Else go to Scrappe
Run:- Start it empty & idle, and minimum run for 35 hour
Then execute it competely.
Related Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.