Introduction to Management Science Question 1 A binding constraint means that th
ID: 3176510 • Letter: I
Question
Introduction to Management Science
Question 1
A binding constraint means that the constraint is exactly satisfied, and its left-hand side does not equal its right-hand side.
True
False
6.67 points
Question 2
Sensitivity analysis is analogous to postoptimality analysis
True
False
6.67 points
Question 3
The Sensitivity Report has two parts: one part deals with objective function coefficient changes, and the other part deals with constraint coefficient changes.
True
False
6.67 points
Question 4
A given constraint has 40 unused hours. The shadow price for this resource would most likely be zero.
True
False
6.67 points
Question 5
The Sensitivity Report typically analyses the impact of simultaneous changes in the objective function coefficients and right-hand side constraint values on the optimal solution.
True
False
6.67 points
Question 6
The information provided in the Sensitivity Report assumes that we are considering a change to only a single input data value.
True
False
6.67 points
Question 7
Surplus is typically associated with which type of constraints?
=
±
6.67 points
Question 8
925
825
100
92.5
none of these
6.67 points
Question 9
The Reduced Cost may be viewed as the difference between the marginal contribution of a variable and the marginal value of the resources it consumes.
True
False
6.67 points
Question 10
The slack values in the Answer Report can refer to either slack or surplus values based on the type of the inequality.
True
False
6.67 points
Question 11
The presence of zeros in the Allowable Increase or Allowable decrease columns for objective function values indicates:
alternate optimal solution
unbounded solution
redundant constraint
infeasible solution
unique solution
6.67 points
Question 12
The 100% Rule can be using to measure simultaneous changes in which of the following?
OFC values
RHS values
LHS values
both OFC values and RHS values
OFC values, RHS values, and LHS values
6.67 points
Question 13
1 and 2
1 and 4
2 and 3
3 and 4
2 and 4
6.67 points
Question 14
no change
a decrease of $100
an increase of $100
an increase of $200
an increase of $35
6.67 points
Question 15
The slack of a constraint indicates the amount of a used resource.
True
False
=
±
Explanation / Answer
1. A binding constraint is a constraint used in linear programming equations whose value satisfies the optimal solution; any changes in its value changes the optimal solution. Once an optimal solution is obtained, managers can relax the binding constraint to improve the solution by improving the objective function value.
So the answer is False