Question
1. For control chart, the lower and upper control limits are usually set at:
five standard deviations from the centerline
four standard deviations from the centerline
three standard deviations from the centerline
two standard deviations from the centerline
e.
one standard deviation from the centerline
2.A company would like their process to have a capability index (Cp) which is:
less than 0.50
less than 1.00
greater than 1.00
equal to that of its competitors
none of the above
a.five standard deviations from the centerline
b.four standard deviations from the centerline
c.three standard deviations from the centerline
d.two standard deviations from the centerline
e.
one standard deviation from the centerline
Explanation / Answer
1)
three standard deviations from the centerline
option C is correct
2)
greater than 1.00
c.three standard deviations from the centerline
option C is correct
2)
c.greater than 1.00