9.-/0 pointsTGInterAIgHS 3.7.011 A clothing manufacturer makes coats, shirts, an
ID: 3185931 • Letter: 9
Question
9.-/0 pointsTGInterAIgHS 3.7.011 A clothing manufacturer makes coats, shirts, and slacks. The time required for cutting, sewing, and packaging each item is shown in the table. How many of each should be made to use all available labor hours? coats shirts slacks Coats Shirts Slacks Time available Cutting 20 min 15 min 10 min Sewing 60 min 30 min 24 min Packaging 5 min 12 min 6 min 125 hr 302 hr 72 hr 6/19/18, 734 PM Hw Mats 120 se0 3.7 12.-/0 pointsTGInterAlgHS 3.7.015 Use the information in the circle graph to determine what percent of a planet's atmosphere is nitrogen, is oxygen, and is other gases. (Assume a-52% and b-10%.) nitrogen oxygen other gases Nitrogen: This is a % more than three times the sum of the percent oxygen and the percent other gases Nitrogen Other gases /Oxygen Other gases: This is 11% less than the percent oxygen Need Help?Warch to TuatrExplanation / Answer
Let coats be denited by x
Shirts by y
Slacks by z
Therfore
20x+15y+10z=125*60=7500 ••••••(1)
60x+30y+24z=302*60=18120 •••••(2)
5x+12y+6z=72*60=4320 ••••••(3)
Solve 1,2,3 we get
Coats (X) = 120mints
Shirts( Y)=220mints
Slacks (Z )=180mints
Related Questions
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.