An article on estimating 28-day strength of concrete considered regressing y = 2
ID: 3259147 • Letter: A
Question
An article on estimating 28-day strength of concrete considered regressing y = 28-day standard-cured strength (psi) against x = accelerated strength (psi). Suppose the equation of the true regression line is y = 1780 + 1.5x. (a) What is the expected value of 28-day strength when accelerated strength = 2550? (b) By how much can we expect 28-day strength to change when accelerated strength increases by 1 psi? (c) By how much can we expect 28-day strength to change when accelerated strength increases by 110 psi? d) By how much can we expect 28-day strength to change when accelerated strength decreases by 110 psi?Explanation / Answer
y = 1780 + 1.5x
1)
Put x = 2550
y = 1780 + 1.5 * 2550
= 5605
2)
When x increasd by 1 , the 28 day standard cured strength increased by 1.5 * 1 = 1.5
3)
When x increasd by 1 , the 28 day standard cured strength increased by 1.5 * 110 = 165
4)
When x decreasd by 1 , the 28 day standard cured strength decreased by 1.5 * 110 = 165
Related Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.