Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

This is slide from project management which is related to cost of the project. K

ID: 326617 • Letter: T

Question

This is slide from project management which is related to cost of the project.

Kindly write short essay of 120-150 words in Ms word from info extracted from this slide only. This short transcript to be present in board meeting for approval of the project with short speech of 2:30 to 3: oo minutes.

Thanks a lot

Thank

Costing and Project Evaluation Concept costs comparisson Nitric Acid Plant CAPEX Cost Breakdown (mln USD) 250 231.2 4.9 190.3 191.8 0.4 25.9 200 1.2 6.4 4.5 0.9 150 100 120 50 5.6 0 Base Case Pilot Plant Two Absorbing Towers Pilot Plant TwoTowers Base Case Description Pilot, 20% costs of main plant Site preparation Main facilities and equipment Auxillary facilities Roads and transportation Transport and comms Utilities /Facilities CAPEX Total min USD mln USD min USD min USD min USD 190.3 4.9 120 S.6 11.3 4.5 6.4 0.9 1.2 9.2 0.4 25.9 190.3 38 5.5 120 5.6 11.3 4.6 5.0 121 5.6 11.3 4.6 6.4 0.9 1.2 9.3 0.5 26 191.8 137.70 0.30 57.36 Net Profit (aftertax) 40.15 Revenue Corporate Tax Rate ros Profit Depreciation annual costs 9.5 min USD Utility Operating costs 9.37 13.15 0.9 1.3 10.1 0.5 27 231.2 Raw Material: NH3: $500/ton Resources FTE Total rehabilitation facilities 48.14 Other costs Headcount costs Design Costs TOTAL 70.82 *Costs include insurance and local taxe

Explanation / Answer

The information that can be extracted from the given slide is as follows:

Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
Chat Now And Get Quote