Gampel Builders manufactures sells storage sheds for commercial use. John Gampel

ID: 3270484 • Letter: G

Question

Gampel Builders manufactures sells storage sheds for commercial use. John Gampel, president of Gampel Builders, is contemplating producing sheds for home use. The activities necessary to build an experimental model, related data and the corresponding PERT/CPM network are given on the next page. Information about the activities and the corresponding PERT/CPM network are shown below.

ACTIVITY

Immediate

Predecessors

EXPECTED

TIME

COST ($)

ESTIMATED VARIANCE

A

---

2

22,000

2

B

A

4

30,000

2

C

A

3

26,000

1

D

A

7

48,000

3

E

B

6

56,000

2

F

B

5

30,000

1

G

C

8

80,000

2

H

D

5

16,000

2

;.’I

E

4

24,000

1

J

F, G, H

6

38,000

2

Times are in weeks.

If we want to bid the job but be 85% confident that it will be done on time, how long should we bid – note the standard deviation of the project 3?

16.9

19.6

23.1

21.04

ACTIVITY

Immediate

Predecessors

EXPECTED

TIME

COST ($)

ESTIMATED VARIANCE

A

---

2

22,000

2

B

A

4

30,000

2

C

A

3

26,000

1

D

A

7

48,000

3

E

B

6

56,000

2

F

B

5

30,000

1

G

C

8

80,000

2

H

D

5

16,000

2

;.’I

E

4

24,000

1

J

F, G, H

6

38,000

2

Explanation / Answer

here ADHJ is on critical path for which expected time =20

and std deviaiton =(2+3+2+2)1/2 =3

for 85 percentile ; z=1.0364

therfore project length =mean +z*std deviation =20+3*1.0364=23.1

hence option C is correct