Question 1 (3 points) Crash and Burn Co. is a defense contractor. Samples of size four are taken to measure the diameter of a special titanium rod it produces for non-critical military applications. The operators are convinced that the machine is not working properly. The machine is guaranteed for any setting between 1.00 and 1.50 cm with a variation of +/- 0.07 cm. The product specifications are 1.20 +/- 0.05 cm. Results are shown below. Does Crash and Burn have a quality problem? Explain.
Date:
June 3 Sample average 1.20 cm
June 4 Sample average 1.22 cm
June 5 Sample average 1.18 cm
June 6 Sample average 1.16 cm
June 7 Sample average 1.24 cm
July 22 Sample average 1.25 cm
July 23 Sample average 1.27 cm
July 24 Sample average 1.28 cm
July 25 Sample average 1.31 cm
July 26 Sample average 1.31 cm
Explanation / Answer
Yes, Cash and Burn have a quality problem since samples taken on 4 days out of 10 days have average product specifications outside the range of 1.20 cm +/- 0.05 cm. Since the mean product specification is 1.20 cm with a standard deviation of 0.05 cm, hence upper control limit is 1.25 cm and lower control limit is 1.15 cm. The samples taken on July 23, 24, 25 and 26 are outliers, i.e. 4 outliers out of 10 samples. This clearly shows that Crash and Burn have a quality problem.