17. A metic used o valuate the cost or the amount of work associated with a spec
ID: 3295548 • Letter: 1
Question
17. A metic used o valuate the cost or the amount of work associated with a specific sampling plan is: A OC B. AOO C. ATI D. ASN E. All of the above 18. Asingle sampling plan has numbers (n 130, c *3). The inspector has inspected 130 units from a lot and found 2 nonconforming. The inspector needs to the following next: A Collect a new sample B. Reject the lot C. Accept the lot Draw the OC to evaluate the quality of the plan None of the above D. E. 19. The chart shows the AoQ for a single sampling plan with n-19 and c4. The Average Outgoing Quality Limit for this plan would be approximately: AOQ curve A. 0.006 B. 0.05 C. 0.07 D. 0.28 E. It cannot be determined with the information o os provided 00s 0.1 0.15 0.2Explanation / Answer
We are allowed to do 1 question at a time. Post again for second question.
17) ALL og the above are used
The ASN curve shows the average number of units inspected (y-axis) for different incoming qualities (bottom axis).
The design of a sampling inspection plan that involves the minimum average total inspection at a given quality level is of practical interest.
Acronym for Average Outgoing Quality. Useful to evaluate sampling planapplications where rejected lots are rectified by replacing or reworking defective items. The AOQ curve is the average quality of outgoing product as a function of the incoming quality.
Related Questions
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.